Archive for February, 2010

Completed!!

Saturday, February 27th, 2010

I finished the label this morning and have the quilt for my sister boxed and ready to mail.  I hope it brings comfort and love.  This is a record for me, conceiving and completing a quilt in a month!

AAQI Priority Quilt-ing

Tuesday, February 23rd, 2010

I’m getting there :)   I’m busy stitching the binding on the pink quilt so no more progress on this until the binding is finished but, no worries, I’ll make the March 16th deadline!

DW Monday :)

Monday, February 22nd, 2010

I had a most productive weekend.  First I quilted the quilt for my sister.  Sophie was up to her usual perfect self…..she is such a pleasure to work with :)   I also cut, sewed and ironed the binding for this quilt AND got it sewn on.  I started the hand stitching this morning on the MetroLink so I’ll have this quilt completed by this weekend.  My goal is to get it in the mail on Saturday.

I also cut the sashing pieces for the last First Saturday blocks from the Quilted Fox, Foxy Fassetts.

I finished piecing a miniature quilt but no picture of it yet…..I’m not sure if it done or not.  The AAQI priority quilt received some more quilting.  In fact, I’m more than half way done.  And last, I cut the setting squares for a leader/ender nine-patch quilt which is on my design wall for Design Wall Monday (DWM).   Sorry for the blurry photo :(   Check out what other quilters have on their other design walls at Judy’s DWM post.

Almost forgot my stash report!

Added:  0     Cumulative Added:  39.5 yds

Used:  .5  (binding)      Cumulative Used:  ~6.5 yds

Net Out/(In):   (33 yds)  

Still Quilting….

Tuesday, February 16th, 2010

Here’s the progress I’ve made on the AAQI Priority quilting. Only one month until the deadline and I’m getting there!

Here’s the backing I pieced for the quilt for my sister.  I used up all but the smallest bits of the fabrics leftover from the top.  Even then I needed the two additional half yards of pink prints I bought for this project but didn’t use on the front.  It’s not balanced like some of the fun backings I’ve seen on blogs recently but I like that it used up everything, including the two extra free pieced blocks from the front.  I really like the flower print.

Monday – Design Wall Time

Monday, February 15th, 2010

Here’s what’s on my design wall today.  I completed not only the top but the backing as well.  This one is ready to quilt :)

Check out what other people are working on at Judy’s DWM blog post.

I get to include the yardage from this finish in my Stash report, yea!!!

Added:  0     Cumulative Added:  39.5 yds

Used: ~6         Cumulative Used:  ~6 yds

Net Out/(In):   (33.5 yds)  That’s better!!!!  At least I have something going out now :)

Hand Quilting

Friday, February 12th, 2010

Here’s my hand quilting progress on my AAQI priority quilt.  Yes, this is the backside as you can’t see the stitches from the front and, yes, that was by design ;) .  This is only my 4th hand quilting project and they have all been miniature quilts so my stitches aren’t all that small.  I’ll have lots of time to stitch while watching/listening to the winter Olympics :)


Design Wall Monday :)

Monday, February 8th, 2010

The Hope quilt is back on my design wall.  I’m thinking on what I want to put between the words and the date.  I’m not happy with what’s up there.  I want to introduce some green but the green squares seem too dark or maybe the background fabric is too light???  I’m thinking of using the fabric on the left for a 2″ border and I love the flower fabric on the right for a wider outer border.

Yesterday I posted my stash report and mentioned a gift certificate I received.  Well, here’s something else I bought with it.

A whole gallon of Best Press, yippee!  I resisted trying this stuff when everyone was raving about on their blogs because it’s a bit pricey, IMO.  Well, once I bought a bottle, I was hooked and as Louise at The Quilted Fox says, “it’s only a dinner out.”  Speaking of The Quilted Fox, I finished both the First Sat block and the alternate block for next month!

And lastly, here’s the AAQI priority quilt all appliqued and basted for hand quilting!  Notice the new flower that just demanded to be added on the right.  And I had already sewn the “planter” down…..don’t you just love it when a quilt insists on something you’ve already decided against?   ;)




Zipper Purse from Portugal

Sunday, February 7th, 2010

I bought two items from the Craft Hope for Haiti Etsy store.  Below is the second item….a terrific zipper purse made by Margarida from Portugal.  It’s it amazing that Craft Hope allowed people from all over the world help?  Margarida has a blog (http://www.margaridagodinho.blogspot.com/) and an Etsy shop (http://www.etsy.com/shop/margaridagodinho).  I love her tags….see it on the right?

I’ve been busy sewing away on things this weekend and am amazed at how many of these leader/enders blocks I’ve gotten made!

Here’s my updated stash report…..more bad news, but it isn’t my fault, really, it isn’t.  I was given a gift certificate to The Quilted Fox and I had to use it :)

Added:  12     Cumulative Added:  39.5 yds

Used: 0         Cumulative Used:  0 yds

Net Out/(In):   (39.5 yds)  Something is still wrong here.  I had better finish something soon!!!!

Just a Few More Stitches

Thursday, February 4th, 2010

…..and I’ll be finished with the applique :)

AAQI Applique Almost Finished

Tuesday, February 2nd, 2010

I finished appliqueing the bird and am on to the last stem, yea!!