Back to Work Monday

It’s been a fun week with a wonderful 4 day weekend ending with 6 plus inches of SNOW 🙂  They were only forecasting 1-3″ so what a wonderful surprise to wake up to a thick blanket of snow!!!! 

We had our guild’s annual fabric swap and I snagged a couple of large pieces.  Carolyn brought two huge bags of scraps and boy, oh boy, did we have a blast digging through them.  I spent Thursday petting, ironing, trimming and folding the scraps into my stash….it was heaven 🙂

Scrap Swap Loot

I also spent some time quilting on Sophie, loading my red string quilt which is one of my finish goals as part of the 2015 Finish-Along. 

Red String QuiltingI spent some more time cleaning up my sewing room and unearthed some liberate churn dash blocks that never got finished from the 2014 RSC.  So I’m getting them done and on the design wall.

DWM 3-2-15I’m linking up with Judy’s DWM post.,,,..go check it out.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Stash Report:

  • Fabric in: ~4 yards (guild fabric swap)
  • Fabric out:  0 yards 
  • YTD Fabric in:  16 yards
  • YTD Fabric out: 21.5 yards
  • Net Fabric In/(Out): (5.5) yards 

Happy Quilting, Cherie

   

2 thoughts on “Back to Work Monday

  1. I’m pleased to see that some of my swapped fabrics went home with you!
    Your wonky churn dash blocks play really nicely with your RSC string blocks! Are you planning to use them together?

  2. Your red quilt looks great. Hope you show a bigger picture when you finish the quilting. Looks like you nabbed some great additional fabrics for your stash.

Leave a Reply

Your email address will not be published. Required fields are marked *